Idukki Hydroelectric Project

Idukki Hydroelectric Project
  1. In 2026, the Idukki hydroelectric project, Kerala’s largest hydel power project, completed 50 years.
  2. About Idukki Hydroelectric Project
    1. Built across the Periyar River in Idukki district, Kerala.
    2. Installed capacity: 780 MW.
    3. The powerhouse at Moolamattom is the longest underground power station in India.
    4. It also has the largest pressure shaft in the country.
    5. The powerhouse contains six generators, each of 130 MW.
    6. It has 3 associated dams: Idukki Arch Dam, Cheruthoni Dam & Kulamavu Dam.
  3. Among these, the Idukki Arch Dam is especially famous because it is
    1. among the top ten highest arch dams in the world
    2. the third highest in India, after Tehri Dam and Bhakra Nangal Dam
    3. the first double-curvature arch dam in Asia and the second in the world
    4. positioned between two mountains: Kuravanmala (839 m) and Kurathimala (925 m).

 