Context
The proposed Siang Upper Multipurpose Project (SUMP) in Arunachal Pradesh has gained strategic importance following China’s plan to develop a 60 GW hydropower project on the Yarlung Tsangpo River in Tibet. However, SUMP faces opposition over tribal displacement, biodiversity loss and seismic risks.
Siang–Brahmaputra River System
- Origin & Names: Starts near the Angsi Glacier in Tibet; known as Yarlung Tsangpo in Tibet, Siang (or Dihang) in Arunachal Pradesh, Brahmaputra in Assam, and Jamuna in Bangladesh.
- Great Bend & Confluence: Takes a sharp southward turn around Namcha Barwa into India, then meets the Dibang and Lohit rivers near Sadiya, Assam.
- Outflow: Joins the Ganga (Padma) in Bangladesh and flows into the Bay of Bengal through the Meghna system.
Strategic Context: China’s Medog Hydropower Project
- Location & Scale: Planned on the lower Yarlung Tsangpo in Medog, Tibet near the Great Bend and Namcha Barwa (close to Arunachal Pradesh), with around 60 GW (60,000 MW) capacity.
- Terrain & Climate Goal: Uses the steep drop of the Eastern Himalayas and supports China’s 2060 carbon-neutrality goal.
- Status & Downstream Risks: Work began in July 2025 with ongoing site clearing and river-diversion activity; raises worries over flow changes, less silt, sudden water releases, and water diversion in India and Bangladesh.
Proposed Response: Upper Siang Multipurpose Project (SUMP) & Its Importance
- Project Overview: Planned on the Siang River in Arunachal Pradesh (Siang and Upper Siang districts), with an estimated capacity of 11,000–11,200 MW, a 280–300 m high gravity dam, and ~9–9.2 BCM (billion cubic metres) of storage capacity.
- Institutional Status: Declared a National Project by the Centre in 2008, with NHPC Limited (National Hydroelectric Power Corporation) handling PFR (Pre-Feasibility Report) survey and preparatory work.
- On-Ground Friction: Survey work faces strong local resistance (including protests across Siang, Upper Siang, and East Siang in October 2026).
- Strategic & Water Buffer: Reservoir storage can absorb sudden upstream water releases, cushion flow shifts from China’s upstream projects, and strengthen India’s prior-use claim.
- Flood Moderation: Regulated water storage can reduce seasonal monsoon flood peaks in Arunachal Pradesh and Assam.
- Clean Power & Grid Balance: Adds low-carbon hydropower to cut fossil-fuel reliance and balance variable solar and wind power.
- Regional Development: Can support jobs, infrastructure, State revenue, fisheries, and tourism, subject to ecological and social viability.
Key Concerns & Governance Gaps
- Village Submergence & Livelihoods: Locals estimate ~27 ancestral villages (including Ugeng, Dite Dime, and Parong) could face submergence affecting over 1.5 lakh people, threatening Adi and Galo ancestral land, farming, forest livelihoods, and local institutions.
- Cultural & Constitutional Gaps: Residents revere the Siang River as Anni (Mother); Arunachal Pradesh is outside the Sixth Schedule, and while the Arunachal Pradesh Scheduled Tribes (Protection of Transfer of Land) Act, 1947 restricts private land transfers, state acquisition for public purpose remains permitted.
- Consent & Trust Deficit: Disputed survey access, security deployment, detentions, and clashes have deepened local distrust and stalled dialogue.
- Seismic & Dam Safety Risks: Located in Seismic Zone V near the fault zone of the 1950 Assam–Tibet earthquake (magnitude 8.6), facing RTS (Reservoir-Triggered Seismicity), slope instability, extreme monsoon inflows, and dam safety
- Hungry Water & Erosion: Trapped silt creates hungry water (clearer water that erodes riverbeds and banks), affecting river morphology and Majuli Island.
- Biodiversity, Farming & Microclimate: Forest submergence, habitat fragmentation, and fish barriers threaten Eastern Himalayan wildlife and Endangered Golden Mahseer (Tor putitora), while lower nutrient-rich silt and reservoir effects can impact Assam farming and local microclimates.
- Legal & Transboundary Gaps: The Forest (Conservation) Amendment Act, 2023 does not automatically exempt large hydropower dams; cumulative basin projects (like Naying on the Siyom River) and no comprehensive Brahmaputra water-sharing treaty add uncertainty.
Way Forward
- Basin & Safety Studies: Conduct a cumulative EIA (Environmental Impact Assessment), earthquake and rock/geological checks, and independent dam safety reviews.
- Community & Land Safeguards: Hold real consultations with local tribes, protect customary land rights, and provide fair compensation and rehabilitation.
- Water, Silt & Disaster Alerts: Keep minimum river flows, manage silt, and set up real-time earthquake/flood monitoring and early warnings under the Dam Safety Act, 2021.
- Cross-Border Talks & Options: Push for shared river data and dialogue among India, China, Bhutan, and Bangladesh, while weighing smaller hydro projects, design changes, and decentralised clean energy.
FAQs
Q1. Why is China’s Medog hydropower project strategically significant for India?
Ans. Its upstream location on the Yarlung Tsangpo raises concerns over river flows, sediment transport and downstream water availability.
Q2. Which tribal community is primarily affected by the proposed Siang Dam?
Ans. The Adi tribe of Arunachal Pradesh, facing potential displacement and loss of ancestral lands and livelihoods.
Q3. What is the hungry water phenomenon?
Ans. Sediment-deficient water released downstream of dams erodes riverbeds and banks to acquire sediment.
Q4. What is reservoir-triggered seismicity?
Ans. Earthquakes triggered by changes in geological stress and pore-water pressure due to large reservoirs.
Q5. Does the Sixth Schedule apply to Arunachal Pradesh?
Ans. No. It applies to specified tribal areas in Assam, Meghalaya, Tripura and Mizoram.