Cauvery–Vellar River Linking Project

Geography

Cauvery–Vellar River Linking Project

Context

The Karnataka government has approached the Supreme Court to stop Tamil Nadu’s Cauvery–Vellar river-linking project, raising a fresh interstate river water dispute. Tamil Nadu informed the Madras High Court that the project’s first-phase work has been underway since 2021.

About the Cauvery–Vellar River Linking Project

  1. Full Name: Cauvery–South Vellar–Vaigai–Gundar River Linking Project.
  2. Executing Government: Undertaken by the Government of Tamil Nadu to carry surplus Cauvery floodwater through canals to water-scarce southern districts.
  3. Core Objective: Expand irrigation, refill tanks and water bodies, and ease drought stress in water-deficient areas.
  4. Diversion Point: Begins at the Kattalai Barrage near Mayanur, in Karur district, Tamil Nadu.
  5. Phased Execution:
  • Phase I: Cauvery–South Vellar
  • Phase II: South Vellar–Vaigai
  • Phase III: Vaigai–Gundar

     6. Interstate Friction: Karnataka has objected to Tamil Nadu’s diversion of Cauvery water, questioning required statutory and interstate approvals.

Other Rivers Associated with the Project

River Key Geographical Features
South Vellar Seasonal, east-flowing river in Tamil Nadu; flows through Pudukkottai district before emptying into the Bay of Bengal.
Vaigai Rises in the Varusanadu Hills (Western Ghats), flows past Madurai, and drains into Palk Bay; upper catchment lies near the Srivilliputhur forest belt.
Gundar Seasonal river rising in the Western Ghats of Tamil Nadu, flowing across southern districts toward the Bay of Bengal.

About the Cauvery River

  1. Origin: Rises at Talakaveri in the Brahmagiri Hills (Western Ghats), Kodagu district, Karnataka.
  2. Course & Mouth: Flows southeast across Karnataka and Tamil Nadu, emptying into the Bay of Bengal near Poompuhar.
  3. Basin States & UT (Union Territory): Spans Karnataka, Tamil Nadu, Kerala, and Puducherry.
  4. Left-Bank Tributaries: Harangi, Hemavati, Shimsha, and Arkavati.
  5. Right-Bank Tributaries: Lakshmana Tirtha, Kabini, Suvarnavathi, Bhavani, Noyyal, and Amaravati.
  6. Major Dams:
  • KRS (Krishna Raja Sagara) Dam: Located in Karnataka.
  • Mettur Dam (Stanley Reservoir): Located in Tamil Nadu.

     7. Agriculture: Its fertile delta is widely called the Rice Bowl of Tamil Nadu.

Linkage with the National River Interlinking Programme

  1. NPP (National Perspective Plan), 1980: Formulated to transfer water from water-surplus basins to water-deficit basins.
  2. Nodal Agency: NWDA (National Water Development Agency) identifies links and prepares feasibility reports and DPRs (Detailed Project Reports).
  3. Proposed Links: Envisages 30 river links—16 Peninsular links and 14 Himalayan links.
  4. Peninsular Link Context: The Cauvery–Vaigai–Gundar stretch forms part of the wider Mahanadi–Godavari–Krishna–Pennar–Cauvery–Vaigai–Gundar peninsular link system.
  5. Irrigation Potential: Per the NWDA DPR, the broader project can provide annual irrigation to roughly 4.48 lakh hectares.

FAQs

Q1. Where does the Cauvery River originate?
Ans. At Talakaveri in the Brahmagiri Hills, Western Ghats, Karnataka.

Q2. Which barrage serves as the diversion point for the Cauvery–South Vellar link?
Ans. Kattalai Barrage at Mayanur, Karur district, Tamil Nadu.

Q3. Which river flows through Madurai?
Ans. The Vaigai River, originating in the Varusanadu Hills of the Western Ghats.

Q4. Which are the major dams on the Cauvery River?
Ans. Krishna Raja Sagara (KRS) Dam in Karnataka and Mettur Dam in Tamil Nadu.